We are
in urgent need of building volunteers to join us in Odessa,
Ukraine from March to June to assist in the completion of
the new International Training Center of the Church
Ministries Institute. We praise the Lord for this beautiful
new facility, which will replace the one that was heavily
damaged in the fire, but at this point it is an empty shell.
All skills and general labourers are needed. As you can see
from the below chart, we are hoping for about 40 volunteers,
while to date we have only about five committed! Can you
help us to get the word out?
The old facility is becoming increasingly expensive to
maintain, is dragging the institute into a deficit, and is
no longer suitable for usage due to heavy damage from the
fire, thus the sense of urgency. This new facility will be
economical, modern, and perfectly suited for what we need.
It is also fully paid for, and registered in the name of the
institute.
The in-country cost for this missions trip is minimal (less
than $500 for two weeks), and airfare in the winter and
spring months is generally less than $1000. If you know of
anyone who might be interested, please have them contact
myself or our project manager,
Tim Rose.
Above all, please pray the God would send His people to fill
up these teams, and that we would be able to complete this
project by the end of June, which is when we would like to
vacate the old facility.
|
Volunteer Team |
Date (duration) |
Minimum Number of Vlunteers Needed |
Number of Volunteers Commited |
Project Task |
Skills Needed |
|
1 |
March 5-?,
2010
(10-15 days) |
5 to 7 |
8 |
-
Tear down existing block wall and reconstruct it
in new location
-
Frame in all partition wall with metal studs
-
Install metal channel on block wall
|
|
|
2 |
March 26-?, 2010
(10-15 days) |
5 to 7 |
7 |
-
Rough in plumbing
-
Rough in electrical
|
|
|
3 |
April 9-? 2010
(10-15 days) |
5 to 7 |
2 |
-
Installing and finishing drywall
-
Finishing all concrete surfaces
-
Install ceiling tile grid
|
-
Drywall/folks skilled in drywall hanging and
finishing
-
Folks skilled in acoustic ceiling tile grid and
tiles
-
Folks skilled in parging block walls
-
General laborers
|
|
4 |
April 30-?, 2010
(10-15 days) |
5 to 7 |
0 |
-
Install and wire all electrical switches, plugs
and lights in ceiling
-
Install plumbing fixtures
-
Install interior doors and windows
|
-
Plumbers/folks skilled with installing plumbing
fixtures
-
Electricians/folks skilled with installing
switches, plugs, lighting fixtures
-
General laborers
|
|
5 |
May 14-?, 2010
(10-15 days) |
5 to 7 |
0 |
-
Install ceiling tiles
-
Painting
-
Install tile on walls
|
|
|
6 |
May 28-?, 2010
(10-15 days) |
5 to 7 |
0 |
|
|
|
7 |
TBD
(10-15 days) |
5 to 7 |
0 |
|
|
|